|
4-1-09 packaging sutdy
Date: 12/21/10
Views: 271
|
4-27-09 packaging study
Date: 12/21/10
Views: 217
|
Early body shape study
Date: 12/21/10
Views: 218
|
Early concept #1
Date: 12/21/10
Views: 222
|
|
Early concept #2
Date: 12/21/10
Views: 229
|
Early concept #3
Date: 12/21/10
Views: 222
|
Early 1/5 scale body mockup
Date: 11/06/09
Views: 266
|
Hatch clearance
Date: 12/21/10
Views: 271
|
|
Sipper update
Date: 12/21/10
Views: 159
|
Front brake rotor and caliper
Date: 12/21/10
Views: 159
|
First frame weigh-in
Date: 09/10/10
Views: 219
|
Weigh-in results
Date: 09/10/10
Views: 201
|
|
Front suspension under construction
Date: 08/19/09
Views: 257
|
Driver's seat fitting
Date: 09/10/10
Views: 259
|
Powertrain test installation
Date: 12/17/09
Views: 227
|
Automatic CVT
Date: 12/17/09
Views: 257
|
|
500cc one lung engine
Date: 12/17/09
Views: 250
|
Firewall and solid state AC unit fitting
Date: 12/08/10
Views: 241
|
Left side passenger seat fitting
Date: 12/08/10
Views: 222
|
Composite lower floor leaning against garage door
Date: 12/08/10
Views: 237
|
|
Mould plug constructed from foam
Date: 01/17/11
Views: 275
|
Wheel house plug
Date: 01/17/11
Views: 249
|
Plug ready for layup
Date: 01/17/11
Views: 240
|
Layup of wheel house begins
Date: 01/25/11
Views: 236
|
|
Finished wheel house
Date: 11/02/11
Views: 128
|
Frame to powder coaters
Date: 08/05/11
Views: 204
|
Sipper frame returning from powder coaters
Date: 08/12/11
Views: 228
|
Final weighing of frame
Date: 08/14/11
Views: 220
|
|
Total with brackets, threaded inserts and powdercoat
Date: 08/14/11
Views: 195
|
High tech double stick tape applied to underside
Date: 08/15/11
Views: 193
|
VHB = Very high bond
Date: 08/15/11
Views: 176
|
Floor stuck on with VHB tape
Date: 08/15/11
Views: 184
|
|
Taped and riveted
Date: 08/16/11
Views: 182
|
Rivet pattern at firewall
Date: 08/16/11
Views: 192
|
Firewall, a/c module, and ISIS power module installed
Date: 08/29/11
Views: 182
|
Interior firewall showing a/c unit and inverter
Date: 08/29/11
Views: 189
|
|
Inter floor spaces are foam filled
Date: 08/29/11
Views: 198
|
Isis master cell and power cell for front of chassis
Date: 08/31/11
Views: 191
|
Trial instrument panel layout
Date: 08/31/11
Views: 190
|
A/C unit undergoing testing
Date: 08/31/11
Views: 231
|